Technology history for greenecountyga.gov

Stack size over time

From 7 detected technologies in Jan 2019 to 25 in Sep 2026 (peak 27).

Currently detected

Previously used

Timeline

2026 1 added · 2 dropped

2025 7 added

  • added Azure Dec 2025 · PaaS
  • added Azure Edge Network Dec 2025 · Miscellaneous
  • added Azure Monitor Dec 2025 · Analytics
  • added Emotion Dec 2025 · JavaScript frameworks
  • added JSS Dec 2025 · JavaScript frameworks
  • added MUI Dec 2025 · UI frameworks
  • added React Dec 2025 · JavaScript frameworks

2024 4 added

2023 1 added · 1 dropped

2022 2 dropped

2021 11 added · 2 dropped · 1 switched

2020 3 added · 2 dropped · 2 switched

2019 7 added

Look up any website for free

No paywall, no lead-gen, no account. Paste a domain and see what powers it.

No account neededHistory since 2018